Stanford Health Care · Clinical Testing Facility

New tenant improvement remodel of an existing building. The relocation of an existing laboratory to Stanford Hospital’s existing off-site facility in Palo Alto, California. The substantial usage of flammables resulted in the addition of a new hazardous materials control area and renovations to the building’s existing HVAC system. Included ADA upgrades to toilets and parking.

Project Area: 2,000 sf

Completed: 2017

Cost: $700K

Services: lab planning, programming, interior and exterior architecture & design

We're Better Together.

© 2022 Stantec Architecture, Inc. |  www.stantec.com

ARCHITECTURE · LABORATORY PLANNING HEALTH CARE DESIGN
We're Better Together.
ARCHITECTURE · LABORATORY PLANNING HEALTH CARE DESIGN
We're Better Together.
We're Better Together.

© 2022 Stantec Architecture, Inc.
www.stantec.com

ARCHITECTURE LABORATORY PLANNING HEALTH CARE DESIGN
We're Better Together.